Niroo Va Tavan is a private joint stock company that is active in context of oil, gas, petrochemical, power plant and industrial complexes projects in form of EPC, that means preforms all of engineering, procurement and construction activity.

NVT, also, presents design, engineering, management & eduction services, and preform the process of installation and implementation, utilization, repairing and maintainance.

NVT was established in September 1984 in Tehran. NVT containing  a qualified and specialist engineering team in different fields of industry.

M.P.O.  assigned NVT the high grade in execution of industries and energy related projects.

At NVT, our success as your partner is not only measured by the quality of your completed facility, but also by the quality of the process by which we get there. We understand that intangibles of a project, dedication to teamwork , focus on client goals, uncompromised quality and relationship built on trust, are just as important as the building itself.

NVT was founded

01/01/1984

NVT was founded

NVT was founded in September 1984 in Tehran by a team of highly qualified engineers in different fields of industry.

KISH ISLAND DESALINATION COMPLEX

23/01/1989

KISH ISLAND DESALINATION COMPLEX

Engineering, Renovation, Construction & Commissioning of 5000 m3 /day Desalination Plant

ALUMINUM POLLUTION CONTROL OF IRALCO ALUMINUM FACTORY

01/04/1990

Detail Engineering, Fabrication, Construction & Commissioning of Pollution Control Centers No. 1 & 3.

SHAHID RAJAI 2000 MW THERMAL POWER PLANT

13/06/1993

SHAHID RAJAI 2000 MW THERMAL POWER PLANT

Construct. & Pre-commissioning of Cooling System of Three  130 MW Steam Turbines. Conceptual Design, Detailed Design of Electrical, Control and Instrumentation of HVAC , Lighting and dry cooling Towers

SHARIATI CCPP

20/08/1993

SHARIATI CCPP

Construction & Commissioning Of 250 MW Power Plant &  Related Auxiliaries Systems.

GHARB 1000 MW THERMAL POWER PLANT

06/06/1995

GHARB 1000 MW THERMAL POWER PLANT

Construction & Commissioning of Electrical, Control & Instrumentation of Condensate System and Wet Cooling  Towers. Effluent & Swage Treatment Plant

BANDAR ABBAS REFINERY PROJECT

01/11/1995

BANDAR ABBAS REFINERY PROJECT

Construction & Pre-commissioning of Nitrogen Unit Demineralized Water & Condensate Treatment System, Potable & Plant Water Unit, Machinery Cooling Water  System, Fuel System, Instrument / Plant Air Unit & Caustic  Soda Dissolving Unit.   Engineering & Construction of 15 Substations Including 63 KV Substations.

MONTAZER GHAEM CCPP

20/06/1999

MONTAZER GHAEM CCPP

Procurement of Under 4″ Piping, & Supports Material, Construction & Pre-commissioning of BOP of Steam Turbines Construction & Pre-commissioning of Cooling Systems of  Three 130 MW Steam Turbines.

SHAHID RAJAI CCPP

22/07/2000

SHAHID RAJAI CCPP

Construct. & Pre-commissioning of Cooling System of Three  130 MW Steam Turbines.  

KERMAN CCPP

29/05/2001

KERMAN CCPP

Construction & Pre-commissioning of Two 159 MW Gas Turbines

MIDUK COPPER CONCENTRATE PLANT

13/11/2002

MIDUK COPPER CONCENTRATE PLANT

Construction, Erection, Test & Commissioning of 180,000  Tons Per Year Copper Concentrating Plant

KARUN III 2000 MW HYDRO POWER PLANT

01/01/2003

KARUN III 2000 MW HYDRO POWER PLANT

Construction, Test & Pre-commissioning of Auxiliary Systems of Hydro Power Plant.

NEKA CCPP

10/06/2004

NEKA CCPP

Engineering, Procurement, Construction  & Commissioning of  Electrical & Mechanical BOP & Erection of Boiler, Steam  Turbine & Generator Engineering, Procurement & Construction of Civil Works, Fire Fighting & HVAC

RUDESHUR 2000 MW POWER PLANT

01/01/2005

RUDESHUR 2000 MW POWER PLANT

Construction  & Commissioning of Electrical BOP and Gas  Turbines of Rudeshur 2000 MW Power Plant – Phase I Power  Capacity (788 MW)

POWER & STEAM GENERATION UNITS IN KHARG OLEFIN COMPLEX

13/07/2005

POWER & STEAM GENERATION UNITS IN KHARG OLEFIN  COMPLEX

Engineering, Procurement, Construction  & Commissioning of a 110 MW (5×30 MW at ISO conditions) Power Plant with the  Steam Generation capacity of 250 Ton/ hr

Damavand CCPP

01/06/2007

Damavand CCPP

Procurement, Construction  & Recommissioning of Main & Auxiliary Cooling System For 3X150 MW Steam Generator Units

Zanjan 3 CCPP

01/02/2009

Zanjan 3 CCPP

BOP Mechanical of Zanjan 3 CCPP As EPC Contract Pre-Commissioning of Power Plant

NGL SIRI

01/04/2010

NGL SIRI

Construction & Pre-Commissioning of Main & Utility  

Shirkoh Yazd CCPP

23/01/2012

Shirkoh Yazd CCPP

Procurement, Construction  & Pre-Commissioning of Main  & Auxiliary Cooling System For 1X484 MW Steam Generator Units  

Jahrom CCPP

11/03/2016

Jahrom CCPP

  PROCUREMENT, CONSTRUCTION& PRE-COMMISSIONING OF MAIN & AUX COOLING SYSTEM (#3 Unit) CONSTRUCTION& PRE-COMMISSIONING OF JAHROM CCPP STEAM UNIT (#6 HRSG)